Precast Pile Precision Management (PM Method)
As a construction professional, we deliver buildings of assured quality. We promise high-precision pile construction management based on our unique standards.
Our company has adopted "Precast Pile Precision Management (PM Method)." This method allows for the measurement of eccentricity during construction, enabling measurements to be taken from a safe location away from the pile driver. Additionally, measuring at each stage serves as a surveying check, allowing for the early detection of surveying errors and significantly shortening the construction period compared to traditional methods. 【Business Introduction】 ■ Reinforced Concrete Construction ■ Precast Pile Precision Management (PM Method) ■ Collaborative Robots (Tomorobo) *For more details, please refer to the related links or feel free to contact us.